Jefit uses cookies to keep you signed in, remember your preferences, and understand how the site is used so we can improve it. Optional cookies power analytics and product insights — they only run if you accept. You can change your choice anytime by clearing your browser storage. Read more in our cookie policy.

Bulking
Intermediate
Machine strength
Plan Details
The PPL - Power and Hypertrophy routine by cliburn89 is a 6 day workout plan. It is an intermediate level plan to achieve bulking fitness goals.
This is a Push/Pull/Legs routine created to increase strength and induce muscle hypertrophy. The first 3 days focus on low reps with high weight. The last 3 days focus on high reps with less weight. You should rest either between the 3 days, after the 6 days, or both. Shoot for between 5-8 reps for the power days and 12-15 for hypertrophy days. Note: If you are a beginner you may want to try a 3 day split iterating weeks. Week A: Push Power, rest, Pull Power, rest, Abs and Legs Power, rest Week B: Push Hypertrophy, rest, Pull Hypertrophy, rest, Abs and Legs Hypertrophy, rest • Day 1 - Push Power • Day 2 - Pull Power • Day 3 - Abs and Legs Power • Day 4 - Push Hypertrophy • Day 5 - Pull Hypertrophy • Day 6 - Abs and Legs Hypertrophy
Routine detail
Day 1
Push Power
Est. 0 min
8 exercises
Day 2
Pull Power
Est. 0 min
8 exercises
Day 3
Abs and Legs Power
Est. 0 min
8 exercises
Day 4
Push Hypertrophy
Est. 0 min
8 exercises
Day 5
Pull Hypertrophy
Est. 0 min
9 exercises
Day 6
Abs and Legs Hypertrophy
Est. 0 min
8 exercises
Try one of these professionally designed workout plans