Routine detail
General
Beginner
Machine strength
Plan Details
The 4-day PPL Bonus routine by GHallas is a 4 day workout plan. It is a beginner level plan to achieve general fitness goals.
A Linear Progression Based PPL modified for 4 days Reddit Thread URL: https://www.reddit.com/r/Fitness/comments/37ylk5/a_linear_progression_based_ppl_program_for/ Workout Notes On the last set of the main compound lifts (listed below), perform as many reps as possible (AMRAP). AMRAP sets in the Workout Routine appear as a separate lift without the rep number listed. At least 5 reps should be performed on the AMRAP set. DO NOT perform AMRAP on bench and overhead press on the same day! On push days, super set the tricep pushdown and overhead extensions with lateral raises. Compound Lifts Deadlift Bench press Squat Barbell row Overhead press Substitutions Pull ups can be substituted with pulldowns or chinups Warm-up WW = working weight Empty bar x10 50% WW x10 75% WW x5 90% WW x3
Routine detail
Mon
Pull
Est. 48 min
7 exercises
Tue
Push
Est. 43 min
8 exercises
Thu
Legs
Est. 37 min
6 exercises
Fri
Bonus Day
Est. 52 min
10 exercises
Try one of these professionally designed workout plans